A good plan is one that is cheap to change

1 day ago
2 min read

In software teams, the phrase "We need to stick to the plan" often surfaces as deadlines loom and new challenges arise. This assumes that a good plan should remain unchanged.


However, a plan is a hypothesis based on initial information, and as teams execute it, they often uncover new insights. Thus, a good plan isn't one that never changes but one that can be easily and affordably adjusted.


Think about how plans become expensive. A roadmap is written months ahead with fixed dates for every feature. Tickets are broken down in detail for work that is three sprints away. Promises are made to stakeholders before the team has touched the code.


When something shifts, and it always does, every one of those commitments has to be renegotiated. Changing direction starts to feel like failure, so teams avoid it and keep building what was planned instead of what is needed.


Cheap plans look different. They are detailed where the team is about to work and deliberately rough further out. They describe outcomes rather than feature lists. They leave room between commitments so that one surprise doesn't knock everything else over. When new information arrives, the team can adjust in a short conversation instead of a week of rescheduling.


This isn't the same as having no plan. Teams without a plan drift from one urgent request to the next and struggle to explain what they're working toward. Direction still matters. Stakeholders still need a rough sense of what's coming and when. The point isn't to stop planning, but to plan in a way that respects how little anyone knows at the start.


There are moments when a fixed plan is reasonable. A regulatory deadline, a contract milestone, or a hardware release may leave little room to move. Even then, good teams keep the parts around the fixed point flexible, so that the one thing that cannot move doesn't drag everything else into rigidity.


The habit also changes how teams talk. Instead of asking "Are we on track?", they ask "What have we learned, and does the plan still make sense?" Managers stop treating a changed plan as a broken promise and start treating it as a sign that the team is paying attention. Developers feel safer raising problems early, because adjusting is normal rather than embarrassing.


Plans that are expensive to change tend to be defended long after they stop being useful. Plans that are cheap to change get improved.